Case Study 1 – Bespoke Garden Studio
- Existing Garden Before Construction
- Studio Arrives Flat Pack
- Studio During Construction
- Completed Project 5 Days
Case Study 2 – Harbour Master
- Modular SIP’s Building During Construction
- Finished Product with Composite Maintenance Free Cladding
- Front Elevation with Glass Balcony
- Open plan made easy using SIP’s Roof & Glulam Beam
Case Study 3 – Garage & Workshop
- Garage/Workshop During Construction
- Traditional Pitched Roof with Trusses & Slate
- Finished Product – 21mm Pressure Treated Shiplap
- White UPVC Windows/Doors. Built in Log Store
Case Study 4 – Modular, Moveable Garden Studio
- Factory Built on Steel Base
- Delivered, Lifted & Moved Easily
- Available For Events & Temporary Accomodation. Off Grid Solar Power